How much does it cost to level a floor before new flooring?

Smooth prepared subfloor before the floor covering is fitted

Before the flooring goes down

How much does it cost to level a floor before new flooring?

A levelling allowance for 20m² ranges from £120 to £600 in a UK laminate-flooring guide. The depth and condition of the floor explain why area alone is only a starting point.

Builders of London team2 min read
Smooth grey levelled subfloor ready for a new finish in a British home

For a 20m² room, a UK guide allowance for levelling screed before laminate works out at £120-£600, with £300 at the average rate. Checkatrade’s June 2026 table lists this preparatory item at £6-£30 per square metre. It gives no thickness, split between materials and labour, or VAT basis. Ask your fitter to specify the depth, preparation and final VAT-inclusive price for the actual floor. Checkatrade’s laminate flooring cost guide.

How deep are the low spots?

Imagine two bare floors of identical size. One has shallow trowel ridges scattered across it. The other drops noticeably from the hall towards the back wall. The same area can require different quantities, preparation and even a different method of repair.

For an idea of how depth affects ordering, ARDEX gives an approximate coverage of 4m² at 3mm thick for a 20kg bag of its K 55 FAST compound. At that uniform depth, 20m² would use roughly five bags before waste. This is a product example. Your fitter should choose the system suited to the substrate and covering. ARDEX coverage information.

Ask whether the floor needs to be flat or level.

A smooth surface can still have a slope. Agree the finish manufacturer’s flatness requirement and any change in height you want at the doorway.

What should the fitter inspect?

Have the floor checked for loose boards, hollow patches, moisture or movement. If a floor has started dipping recently or feels springy, commission an assessment of the cause before agreeing a surface treatment. Filling a low spot cannot stabilise a moving structure.

For an occupied home, ask when the floor can accept the chosen covering and when the room can return to use. A surface that can take foot traffic may still need time before the next product is applied. Establish who removes old adhesive and who adjusts doors or thresholds afterwards.

Our guide to engineered wood and LVT compares finishes. Include the preparation allowance in a refurbishment quotation before comparing the cost of the floor you will see.

Find out how Builders of London can help

Tell us the room size, existing floor and finish you want. We can help establish what needs checking before the flooring is ordered.

Builders of London team
Practical building advice for London and Kent.
Explore our work   ·   Follow BOL on Instagram

Planning a project?

Tell us about your renovation and we’ll help you plan the next step.

Book a consultation → 0203 834 9626

Planning a Building Project?

Speak to Builders of London about extensions, loft conversions, refurbishments and commercial projects across London and Kent.